This website is currently under renovation to improve accessibility for users with disabilities. This process coincides with efforts to achieve and maintain compliance with Web Content Accessibility Guidelines. If anyone encounters an inaccessible feature on this website, please contact Amanda Roberts, City Clerk at (352) 465-8500 or mroberts@dunnellon.org to advise what inaccessible feature was encountered, and to allow the City to provide the desired information through alternative means, until such time as the website renovation is complete.

Home

Posted on: April 11, 2019

FDOT - REVIEW OF SAFETY AND OPERATIONS AT THE PEDESTRIAN CROSSWALK IN FRONT OF BLUE GATOR

March 21, 2019


Ms. Dawn M. Bowne City Administrator
20750 River Drive
Dunnellon, FL 34431

Re: Section 36060 -  MP 0.097 to MP 0.117
 US 41 from the Brittan Alexander Bridge to River Drive Marion County

Dear Ms. Bowne:

We have completed our review of safety and operations at the pedestrian midblock crosswalk between the Brittan Alexander Bridge and River Drive in the City of Dunnellon, Marion County. The study was initially requested by the City with an emphasis in improving safety and operations at the subject crosswalk.

Our study found the need for short and long-term improvements as follows:
Short-term  improvements
  • Add flashing beacons to the advanced pedestrian crossing signs
  • Add double white lines on the approaches to the crosswalk extending past the "PED XING" pavement markings
Long-term  improvements
  • Construct a directional median at the Blue Gator restaurant/ boat ramp driveway
  • Construct an overhead pedestrian hybrid beacon with a mast arm to replace the existing midblock crosswalk
The short-term improvements will be installed by our Traffic Operations Pushbutton group as funding becomes available. Please coordinate with Mr. Kevin Marquez (386-943-5527) for questions and schedule updates for the project.

The long-term improvement recommendations will be used to submit applications for the current Federal safety funding cycle. If Federal safety funding is secured the anticipated date to begin construction should be in Fiscal Year 2023 (July 2022 to June 2023). Please coordinate with Mr. Tony Nosse (386-943-5334) for questions and schedule updates for this candidate safety project.

The original electronic signed and sealed traffic study will be sent via email to accompany this letter.

Sincerely,
James S. Str  z, Jr., P.E.
District Traffic Operations Engineer District Five